Infrastructure Setup-Water Supply Sewage Discharge Power Supply




Water Supply

Water quality at the processing zone complies with state health standard GB5749-8 for domestic water. It is programmed to supply 60,000 tons of water per day.

Water Discharge

Four rain water discharge pump stations are scheduled to be build in the neighbourhood of the processing zone with a total water discharge of 100m3/s. Its service area covers the entire Export Processing Zone.

Sewage Discharge

Three sewage disposal plants will be constructed near the processing zone with a capacity of disposing 320,000 tons per day. The service area can cover the entire Export Processing Zone.

Power Supply

Electric power in the processing zone is distributed and supplied by the Northeast Power Network.. Two 66kV transformer stations are planned to be built here. Power with a voltage of 10kV(±10%) will be supplied inside the zone.

Heat Supply

A central heating system is in place. Water-out measures 130℃ and water-back measures 70℃. Exit pressure from the powerhouse is 4kg/m2.

Communication

One terminal station with 40,000 to 60,000 terminals is planned for construction inside the zone which can supply many communication services. Broadband networks and ring-shape fiber networks have been laid inside the zone which may provide 10mb bandwidth accession to users.

 


 




Liaoning Shenyang Export Processing Zone
Copyright© 2004-2010
about | contact | navigation | links | top